11. blue playbook - Evacuation
Pre-authorized Action Plan
- Engage Escape Plan
- Prepare an escape plan (lateral/upwind)
- Assign an Access Control Officer
Level 1 plus the following:
- Engage escape plan from Isolation Zone
- Access Control Officer – open critical access points (gates, doors, etc.)
- Head count and life safety concerns
- Status of refuge/SIP location(s)
- CAN Report to Plant IC
Level 1 & 2 plus the following:
- Evaluate weather and exposure concerns and on-site/off-site plume movement.
- Long terms needs; move to off-site locations, transport, food, water, bathrooms, etc.
- Prepare for release or return to work orders (safe movement and status check-out forms).