3. red playbook -

Edit mode

Control Plan:

1. 2. 3. 4. 5.

1.

2.

3.

4.

5.

Additional Resources

No Resources Found

  • Purpose

    Control the release so that no further threat or unforeseen impact is imminent.

  • Strategy

    Identify and control valves that supply the component and develop an isolation control plan that defines the sequence of valve controls that stop the chemical release.

  • References

    Bottom of Playbook for all Web-App page links

  • Command

    Technician level commanders and entry team members supported by technical specialists and integrated command between facility and public safety responders.

  • Safety

    All operations are guided by an Incident Action Plan and Safety Plan, with priority on assuring that the control plan will achieve the objective without setting up another threat.

  • Definitions:

  • Abbreviations and acronyms are explained in the All-Hazards Response Guide pgs. 59-60 and a link in the References list at the bottom of the Playbook.

  • Control Zone Layout: see back of the 30-Minute plan and develop awareness of the purpose and location of the Hot Zone, Warm Zone – Decon Corridor, and Cold Zone.
  • Image Resources

    No Images Found

    Edit Take 5's:

    Note: Blank fields will revert to default upon submission






    ?

    standard take 5

    displays take 5's individually

    legacy take 5

    displays all 5 take 5's at once


    <

    THE 30-MINUTE COMMAND TEAM

    SUSTAINED RESPONSE AND TERMINATION

    Close Menu