Emergency Plan:

1. 2. 3. 4. 5.

1.

2.

3.

4.

5.

Additional Resources

No Resources Found

Click here to load this Caspio Cloud Database
  • Purpose

    Reduce life safety and environmental damage by safely engaging emergency system control measures outside the Hot Zone.

  • Strategy

    LANCE CAN do SIMPLE Emergency Control measures.

  • References

    All-Hazards Response Guidebook pages command (pages 27-35), Safety (pages 36-38).

  • Command

    Plant IC to coordinate the evacuation of the Isolation Zone and engage emergency system control measures.

  • Safety

    A site Safety Officer should be considered when responders are working near the Hot Zone.

  • Definitions:

  • LANCE Can do Simple PLANS to Recover: A statement of acronyms that describe each emergency response phase listed in the 30-Minute Plan.

  • Safety Zones
    Exclusion zone (or hotzone): is the area with actual or potential contamination and the highest potential for exposure to hazardous substances.
    Contamination reduction zone (or warm zone): is the transition route between the exclusion and decontamination zones and then to the support zone.
    Support zone (or cold zone): is free from contamination and that may be safely used by the command team, responder rehab, and equipment staging.
  • Image Resources

    Click here to load this Caspio Cloud Database

    No Images Found

    Edit Take 5's:

    Note: Blank fields will revert to default upon submission






    ?

    standard take 5

    displays take 5's individually

    legacy take 5

    displays all 5 take 5's at once


    Click here to load this Caspio Cloud Database

    THE 30-MINUTE COMMAND TEAM

    INITIAL RESPONSE STAGE

    Close Menu