Green playbook – Initial response
Engage SIMPLE:

SOURCES OF IGNITION AND FIRE THREAT: Mitigate, monitor, control

ISOLATE THE LEAK: Control flow into and out of leak site

MANAGE PRESSURE: Control energy (heat) within the system

PRESSURIZED VENTILATION: Mechanical ventilation and portable fans

LIFE SAFETY: Rapid entry rescue in the Isolation Zone.

EMERGENCY PLAN: Develop and Incident Action Plan and Safety Plan

Pictures of the sides of the building

Hyperlinks: Index of all hyperlinked playbook options

NOTE: Playbook details follow the LANCE CAN use a SIMPLE. The action plans are not arranged sequentially. Photos and details are provided to support the system control decisions.

THE 30-MINUTE COMMAND TEAM

INITIAL RESPONSE STAGE

Close Menu