  • Purpose

    Contain the chemical release or fire to reduce impact; the component control plan is on the next web-page.

  • Strategy

    Focus the control plan on movement of chemical to and from the release point. Assure that the control plan is safe, no potential trapped liquid or unforeseen threats.

  • References

    Bottom of Playbook for all Web-App page links

  • Command

    Technician level commanders and entry team members supported by technical specialists and integrated command between facility and public safety responders.

  • Safety

    All operations are guided by an Incident Action Plan and Safety Plan, with priority on entry team safety (e.g. on-air time, back-up, decon, and rehab).

  • Definitions:

  • Abbreviations and acronyms are explained in the All-Hazards Response Guide pgs. 59-60 and a link in the References list at the bottom of the Playbook.

  • Control Zone Layout: see back of the 30-Minute plan and develop awareness of the purpose and location of the Hot Zone, Warm Zone – Decon Corridor, and Cold Zone.
  • C&C Plans

    Click here to load this Caspio Cloud Database

    No C&C plans found Found

    Edit Take 5's:

    Note: Blank fields will revert to default upon submission






    ?

    standard take 5

    displays take 5's individually

    legacy take 5

    displays all 5 take 5's at once


    THE 30-MINUTE COMMAND TEAM

    SUSTAINED RESPONSE AND TERMINATION

    Close Menu